(USED) METAL SUPREME FRG6VE Chicken Rotisserie - 30 Chickens-Gas
Metal Supreme Rotisserie Oven, liquid propane gas, (6) stainless steel spits, (30) chicken capacity, (30) chickens/hr average productivity, tempered-glass sliding doors, stainless steel front, sides & interior cavity, aluminum top & back, adjustable feet, 90,000 BTU, 110v/50/60/1-ph, 9.5 amps
S/N 21FRG6VE0043
MID:1793319710
Ā

Condition Assessment
Initial Inspection Findings
Upon receipt and initial evaluation, the equipment underwent a comprehensive inspection to identify any defects, wear, or operational issues that required attention prior to resale.
Issues Identified and Root Causes
1.Ā Mechanical Wear
Cause:Ā Extended operational use under normal working conditions resulted in wear to moving components and mechanical assemblies.
Symptoms Observed:
-
Reduced operational efficiency
-
Increased noise during operation
-
Minor vibration irregularities
2.Ā Electrical System Degradation
Cause:Ā Age-related deterioration of electrical connections and components due to thermal cycling and environmental exposure.
Symptoms Observed:
-
Intermittent power fluctuations
-
Worn cable insulation
-
Oxidized connection points
3.Ā Cosmetic Damage
Cause:Ā Surface-level damage from regular handling, transportation, and storage.
Symptoms Observed:
-
Scratches and scuff marks on exterior panels
-
Faded labels and markings
-
Minor dents on non-critical surfaces
Repair Actions Taken
Mechanical Repairs
-
Replaced worn bearings and bushingsĀ to restore smooth operation
-
Lubricated all moving partsĀ with manufacturer-specified lubricants
-
Adjusted and calibrated mechanical assembliesĀ to factory specifications
-
Replaced damaged seals and gasketsĀ to prevent future leaks
-
Tested all mechanical functionsĀ under load conditions
Electrical System Restoration
-
Replaced degraded wiring and cablesĀ with new, certified components
-
Cleaned and treated all electrical connectionsĀ to remove oxidation
-
Tested voltage and current levelsĀ across all circuits
-
Replaced faulty switches and control elements
-
Verified proper grounding and safety systems
Cosmetic Refurbishment
-
Cleaned and degreased all surfacesĀ thoroughly
-
Applied touch-up paintĀ to scratched and worn areas
-
Replaced damaged exterior panelsĀ where necessary
-
Installed new identification labels and safety markings
-
Polished and restored finishĀ to improve appearance
Quality Assurance Testing
-
Conducted full operational testingĀ under simulated working conditions
-
Performed safety compliance checksĀ per industry standards
-
Documented performance metricsĀ and compared to manufacturer specifications
-
Completed final inspection checklistĀ with passing results
-
Issued certification of refurbishmentĀ with test data
Final Equipment Status
Operational Condition:Ā Fully functional and tested
Cosmetic Condition:Ā Good, few dents